Force Majeure: Unforeseeable Circumstances That Prevent Contract Performance in Construction Projects

Term Definition - Force Majeure is a specialized legal provision within a construction contract that relieves parties from liability or obligation when an extraordinary, catastrophic event occurs that is beyond their collective control. For a condition to qualify as Force Majeure, it must render the performance of the contract impossible or radically different from what was originally intended. It is fundamentally a mechanism for equitable risk distribution, ensuring that neither the owner nor the contractor is unfairly penalized for the "whims of fate." In the construction industry, these clauses are vital because of the high-stakes nature of project deadlines and the significant financial penalties (liquidated damages) associated with delays. When a Force Majeure event is declared, the contractor is typically granted an "Excusable Delay," which pauses the project clock and prevents the assessment of late fees. This allows for a "cooling-off" period where both parties can assess the damage and decide whether the project can proceed once the event subsides. Crucially, Force Majeure is a creature of contract. Unlike some legal principles that exist by default, the protections afforded by Force Majeure are strictly defined by the words on the page. If a specific event—such as a cyber-attack or a pandemic—is not listed or covered by the general language of the clause, the affected party may still be held to their original performance standards regardless of the difficulty.

A Detailed Explanation

The application of Force Majeure in construction typically hinges on four pillars: 

  • Externality (the event was not caused by the party)
  • Unforeseeability (it could not have been reasonably anticipated)
  • Irresistibility (it could not have been avoided or overcome)
  • Notice (the party must follow strict contractual protocols to invoke the clause).

When a Force Majeure event occurs, the legal “machinery” of the construction contract changes. Most standard forms, such as AIA A201 or FIDIC Silver Book, distinguish between “Force Majeure” and “Change in Law.” While the outcome—a delay—is the same, the compensation might differ. 

It is a common industry standard that Force Majeure provides “Time but no Money.” This means the contractor gets an extension of the completion date but must bear their own costs for idle machinery, overhead, and demobilization. However, if the event persists for an extended period (usually 84 to 180 days), either party may have the right to terminate the contract entirely for convenience.

Origin/Etymology

The phrase originates from the French “force majeure,” meaning “superior force.” It was codified in the Code Napoléon (1804), officially known as the French Civil Code, which significantly influenced civil law systems worldwide. 

In English law, the concept was traditionally more rigid under the doctrine of “absolute liability” until the 19th century, when courts began recognizing that “acts of God” or “the King’s enemies” should provide a narrow window of relief. Today, the term is used globally as a standard heading in international construction law.

Example

A contractor is hired to build a skyscraper in a metropolitan area. Mid-project, a massive civil insurrection occurs, leading the government to declare a state of emergency and a mandatory city-wide curfew. Construction crews cannot access the site, and the supply of concrete is cut off. Because the “civil unrest” and “government action” were outside the contractor’s control and were not foreseeable at the time of the bid, the contractor invokes the Force Majeure clause to pause the project timeline without being sued for breach of contract.

Use Cases 

  • Acts of God: Severe weather (hurricanes, tsunamis), volcanic eruptions, or earthquakes.
  • War and Hostilities: Invasions, rebellions, or localized armed conflicts that halt logistics.
  • Labor and Supply Chain Shocks: Nationwide “general” strikes or sudden total embargoes on essential materials.
  • Regulatory Shifts: Sudden government-mandated site closures (e.g., during a public health emergency).

Benefits & Drawbacks

Benefits: 

 

  • Solvency Protection: Prevents contractors from facing ruinous liquidated damages for events they didn’t cause.
  • Project Stability: Provides an orderly process for pausing and restarting work rather than immediate litigation.
  • Clarity: Defines the boundaries of “acceptable” excuses for non-performance.

 

Drawbacks: 

 

  • Financial Imbalance: Often leaves the contractor paying for “soft costs” (extended insurance, equipment rentals) while the project is stalled.
  • Legal Ambiguity: “Foreseeability” is highly subjective and frequently litigated in court.
  • Administrative Burden: Failure to provide notice within 24–72 hours can result in the total loss of the right to claim the extension.

Q&A

No. If you are building in Florida during hurricane season, a standard storm is “foreseeable.” Only a “100-year storm” or record-breaking event typically qualifies.

Generally, no. A subcontractor’s failure is considered a commercial risk that the prime contractor must manage.

No. Frustration occurs when the contract becomes impossible to ever finish; Force Majeure is usually a temporary suspension.

Yes. For example, if a massive flood destroys the owner’s ability to provide the site or make payments, they may seek relief.

Most modern contracts explicitly list terrorism as a Force Majeure event, but it was less common in older templates.

It is a phrase like “and any other events beyond the party’s control,” intended to cover events not specifically named.

Almost never. While it may excuse the work, it rarely excuses the obligation to pay for work already completed.

Most new contracts now specifically list “pandemics” or “epidemics,” and many have separate clauses for “Public Health Emergencies” to avoid ambiguity.