The construction industry is impossible without accurate calculations and precise project planning. That is why preconstruction services are required for better building performance. Among the most demandable approaches for the initial construction stage are cost estimation and budgeting arrangements. These practices bring better results if special-purpose software is used.
The modern bidding programs and digital estimators make all the measurements and risk estimations without computational errors and other inaccuracies. The preconstruction phase together with the first drawings and project plans is completed faster with the powerful estimating software. These estimators come in handy for 100% automated budget planning as well.
What Are the Main Practices for the Pre-Construction Stage?
The first method is to analyze the architect’s schematic design and suggest the first budget for the project. The SD insights will give not a full picture but 20% of the main budget-driven information. Of course, it is far from the most precise estimating practice. But it is just the beginning of the pre-construction stage. This set of information based on the architect’s drawings is taken into consideration together with other important data:
- A draft of the site plan;
- Drafts of the floor plans and elevations;
- Construction requirements (legal base);
- Consumer’s expectations and demands.
This way SD drawings become not the only entry data for ongoing estimating practices. All the information gathered on this pre-construction stage is used to identify the fundamental insights before managing the budget balance and other specials of the project. This way the initial budget planning takes place. The next step is using project bidding software to marshal all papers and put all the first estimations in order.
Why Use Estimators on the Pre-Construction Stage?
Remember that before using some programs for building purposes we have only 20% complete in the context of the project drawing (provided by the architect). The project team enters all the entry data to the fully automated estimator to get more precise insights. The early budget-planning stage comes to an end because the modern estimating software is responsible for accurate results now.
The estimating program develops a model with the project cost plan based not only on the SD drawings but on the above-listed drafts and clients’ expectations. Then, the construction bidding progress depends on the projections delivered by the software. The contractor analyzes the results given through the automated estimating procedure and picks sides with the further project planning practices.
It is important to avoid an over-promising approach to budget planning and under-estimations for construction decision-making. The software improves the entry data with calculations to a higher accuracy level, so the results should not be angled. Both commercial and residential buildings should start with the following cost planning stages:
- Architect’s design, first design costs;
- Construction costs based on the SD design;
- Anticipated costs;
- Potential costs;
- Estimator’s cost plan;
- The final version of the budget.
Note that all the costs can be divided into smaller categories. The project team can add soft (design costs) and FF&E (furniture, fixture, equipment) costs grouped. Leasing costs and fees for the legal background (jurisdiction and permission fees) also should be presented in the budget plan. The supplementary appropriation title is landscape design costs, surveying, inspections, financing, and escalations.
The Best Construction Estimating Methods and Techniques You Should Know
Select the software that takes into account all the spending budget lines to deliver the most precise cost plan for the construction team. Among other methods and techniques in the context of building (including the estimating and budgeting stages) are:
- Drawings should be extremely accurate. The initial phase, so-called pre-construction, requires only detailed drawing tables from architects.
- Cost escalation is about analyzing market trends and risks the project team may phase during the building process.
- The best estimating performance depends on updates. Any changes should be added to the initial budget for customizing the final variant and preventing losses.
- Analysis of the project requirements (from both the legal and client sides) is a must. This way you will verify the scope and deliver the best-matching estimations.
- Such extra spending like soft and FF&E costs should be added to the budget plan. Do not forget about permitting and inspection costs as well.
- All the supplementary (but required) fees should be taken into consideration. For example, the jurisdictional fee is seldom added as the budget line.
It is worth mentioning that one of your budget items should be the improvement and configuration costs. Sometimes it is more reasonable to implement a new tech solution but cut the time spent significantly. Using estimating software is a good deal when it comes to construction. Almost all the pitfalls and extra fees (risky situations, workflow failing, etc.) that are necessary for the building processes are presented in the system.